1. The equipment should be installed at the level of the concrete foundation and fixed with the anchor rod.
2. The installation should pay attention to the main body and vertical level.
3. Check whether some bolts are loose after installation and strengthen the host country’s warehouse door and require tightening.
4. Configure the power cord and power control switch according to the device.
5. After inspection, empty load test, test, and production can be normal.