1. Check whether the mechanism has a warehouse door before starting. It is forbidden to open the door during the operation of the machine to prevent danger.
2. The crusher must be empty to start and will be in normal operation before it is under the purpose of production.
3. According to the requirements of the particle size of the input material, the assembly has caused equipment damage and low output.
4. In the event of abnormal interruption, stop checking, solve the problem, and then use it for production.
5. Constantly add lubricant and rotate bearing parts.